With these Sewer Holding Chambers provided on the plan as build-on-site, the unique site requirements proved this solution to be unworkable in time and cost efficiencies

The Solution

Three (3) x precast 7000L tanks provided as an inter-connectable stormwater detention systemAustralian Tanks provided a precast solution using two (2) 20,000L tanks. Both tanks are fully trafficable and anti-floatation with all benching, coating and connections in place prior to installation. As a precast solution, installation was complete within one (1) hour and fifteen (15 minutes), further offering time, cost and site OHS saving

The Results

  • Arrival Onsite at 12:05pm
  • Fully installed by 1:20pm
  • Anti-floatation and trafficable by a fully loaded semi-trailer
  • Onsite efficiencies and project savings showing this solution to be more cost effective than original built-onsite system

Products

  • Australian Tanks 20,000L (x 2)
  • Inter-connectable precast tanks with coating and benching
  • All penetrations, risers and access frames
  • All sealant supplied for installation
  • T44 traffic rated
Bloomer Constructions
With these Sewer Holding Chambers provided on the plan as build-on-site, the unique site requirements proved this solution to be unworkable in time and cost efficiencies.

All our product specs any time.

Are you planning for an upcoming project? Our Engineer’s Hub can help you find the product you need, quickly and easily.

Every detail is here for you when you need it, at your own leisure, to help you discover what is the right fit for your project.

Gain access to all the required plans to determine which product meets your needs and be able to specify the solution into your design with downloadable CAD drawings.

Complete access to all our documents