Coomera Town Centre

Coomera Town Centre South

The Challenge

Australian Tanks worked with the engineer on Coomera Town Centre South to come up with a custom solution. This multi-tank option could be constructed within a tight timeframe, allowing the client to maintain their schedule. 

The client was unable to come up with a solution using other products that would deliver in the time frame that the project demanded. The project required multiple tanks to accommodate the necessary capacity while accommodating the unique requirements of the site.

The Solution

Utilising the Parthenon system, Australian Tanks installed a stormwater detention tank with over 200kL capacity within 2 days. These tanks are immediately trafficable allowing access to all areas of the work site straight after completion. This ensures that any Australian Tanks installation does not impact the progress of other parts of the site, saving both time and money for the client.

The unique design of the Australian Tanks Parthenon OSD tank system allows for complete customizability. This makes it a great choice in unique construction situations, where a creative solution is required. The pre-cast concrete OSD tank system is delivered straight to the site on the day of installation. This minimises the requirement for a laydown area which could impact access to various parts of the site, increasing the site productivity.

The Results

Civil 360, Golding Contractors and Foxwell Developers were all happy with the final outcome provided by Australian Tanks. The time frame was met, allowing the project to move forward and make deadlines while the stormwater detention requirements were met.
We are proud to have been part of this project and look forward to working with these clients again in the future.

Products

22 Kiln st, Darra, Qld
Australian Tanks teamed up with CIP to design and install 30 Parthenon modules at 22 Kiln St, Darr, Queensland.
The storm-water detention system was to be installed in the driveway and would impact access to the site to a fast and effective solution was required.
Kiln St, Darra
Australian Tanks teamed up with Hutchinson Builders and ADG Engineering to install 1.4 Million litres of stormwater detention at Kiln St in Darra Queensland.
Tile Street Detention system
Australian Tanks teamed up with Vaughn Construction and VTCE to provide an on-site detention system that met the filtration requirements.
Residential development – Denman Prospect ACT
A unique hybrid installation combining both water retention and water detention.
Coomera Town Centre South
Australian Tanks teamed up with Civil 360, Golding Contractors and Foxwellat the new Coomera Town Center South, 64 Foxwell rd, Coomera.
Beavis & Bartels Pty Ltd
Project required 150,000L water storage for reuse at the Aldi Brendale distribution centre truck wash bay.

All our product specs any time.

Are you planning for an upcoming project? Our Engineer’s Hub can help you find the product you need, quickly and easily.

Every detail is here for you when you need it, at your own leisure, to help you discover what is the right fit for your project.

Gain access to all the required plans to determine which product meets your needs and be able to specify the solution into your design with downloadable CAD drawings.

Complete access to all our documents